Mezzanine A and B: Installation of 140,000 sf mezzanine to the existing warehouse.
Mezzanine C: Installation of 24,000 sf structural frame and concrete deck to existing warehouse including mechanical upgrades; HVAC, Electrical, and Sprinkler Systems.